The project consists of a DCP providing 55,000 Refrigeration Tonnage chilled water supply to surrounding buildings in Jabal Omar Development.
The cooling plant employs water- cooled electric driven centrifugal chillers and Variable primary flow pumping scheme located in the Basement levels of a Hotel Tower, distribution of chilled water to various buildings via a network of piping system that runs either underground or within a tunnel.
Prepare EPC contract & Design Review.