Five Star Hotel including 190 Rooms Single & Double wings , 10 Chalet Pipes & 10 Villas Pipes in addition 2 presidential Villas , Restaurants and conference halls for a business center, a swimming pool and a health club for this project.
Five Star Hotel including 190 Rooms Single & Double wings , 10 Chalet Pipes & 10 Villas Pipes in addition 2 presidential Villas , Restaurants and conference halls for a business center, a swimming pool and a health club for this project.
A Hotel with an area of 300,000 m² representing 350 keys hotel & service apartments under one of its hop brands well known as “ W “
MEP Design & Supervision for the renovations works HVAC, Fire Fighting, Electrical works (power & Light Current)
The scope of work included refurbishment & new design.
Allied has carried out the renovation process in compliance with Hilton Standards & Design.
MEP Design and Supervision for the renovations works ( HVAC, Fire Fighting, Electrical works (power and light current) in certain
areas of the hotel as follows: Ground, First & second floors, consisting of: Main Lobbies, Restaurants , Ballrooms, Kitchens &
Swimming pool floor, In addition to 7 guest floors (Phase 1).
The scope of work included refurbishment and new design. In addition to carrying out the design of phases 2 and 3, consisting of 23 guest floors. Allied has carried out the renovation process in compliance with Hilton standards and design.
Renovation works of main power substation with an area of 100 m2 including all related equipment and cable routings.
(A&P) in cooperation with Allied Consultants were appointed by EGOTH to upgrade MEP works of the luxury Sofitel Winter Place hotel at Luxor. The MEP works will be redesigned in relevant areas based on the new Interior and Architectural changes, if any. The existing equipment and services at hotel will be replaced with new ones or reused according to their conditions and to impact of changes in design requirements.
Upgrading IT network of guest rooms at garden wings B, C, D & E in addition to related restaurants, health club and admin
area. The design works were prepared to match Marriott design standards. Design stages reviewed and approved before
moving to next stage. In addition to Renovation of the MEP works 4 wings: B,C,D,E in addition to main kitchen, El Khalifa ballroom, Lobby, HR & Accounting Departments executive lounge (including Arch. Scope of work) and kitchen equipment In Addition to design and construction supervision of Golf club
Sheraton Cairo Hotel & Casino was closed for renovations until the end of 2016 for the execution of the final stage of the refurbishments and renovations.
By the end of this phase, we will have a complete makeover of our 650 Bedrooms, Public Spaces, 11 new Restaurants and Bars, new Ballroom, a new Entrance, a new Lobby, a new Façade, a State of the Art Business Center with adjacent board rooms, and a Sheraton Core Performance Fitness Center & Spa took place.
Renovation Works consisting of Design and supervision for the areas: Staff Cafeteria, VIP Lounge, Bar Lounge and the Bakery area, in addition to Design and supervision of guest room exhaust air system, smoke extract system, air pressurization system .