Arch., Structure and MEP Design works related to design a 45000 TR combined District Cooling Plant and STP facility at Bahrain Bay. The scope also covers all technical assistance to contractor including shop drawings preparation, RFQ preparation and evaluation.
Full Design Technical Assistance & Shop Drawings Preparation.