The office building consists of three basements and 6 floors.
The task covered MEP services including.
1. Mechanical work: HVAC, Plumbing and fire fighting.
2. Electrical work: Power, Lighting, Cable routing, Fire alarm and Low current systems.
MEP Design Works for 5 floors / 2 Basement office to be related to companies .