The project consists of two stages :
• Rehabilitation of the old kitchen
• Old kitchen includes four floors with area of 1200 m² for each
• One floor for the kitchen equipment and the other floors for training centers
Design and supervision of MEP for he new extension factory which consists of various product
lines that follow latest technology of operation and power saving.
• Factory area about 5000m² with two floors.
• The factory electric power is 2mw
Design and super vision of Mechanical and Electrical work for the old kitchen and new extension factory