ABRAJ KUDAI is a mixed-used development located at the Manafia area in Mecca’s central zone,
only 2.2km south of the Holy Haram in Makkah, Kingdom of Saudi Arabia.
ABRAJ KUDAI is a mixed-used development located at the Manafia area in Mecca’s central zone,
only 2.2km south of the Holy Haram in Makkah, Kingdom of Saudi Arabia.
Building within zone S7, which is part of south zone, compromise of 1 podium with 8 levels and 5000 sq. Area in addition to 3 hotels towers each of 25 floors.
The podium accommodates the district cooling plant, hotel lobbies and technical areas.
The security building Plot 1 is one from a group of four buildings that are considered part of the Fourth Expansion of the Holly Mosque located in Shamiya area in the Holly Mecca, Saudi Arabia with a total built up area of around 220,000 m2, and it is comprising of three towers over one common podium.
The podium consists of basement and 5 floors, with area of 17,100 m² per each floor. Each tower has 16 floors, with area of 2380 m² per each floor per tower.
Amwaj Rotana Resort/Jumeirah/ Dubai will have 300 deluxe rooms and suites/ a wide variety of food and beverage venues/ meeting rooms / state of the art fitness center and access to a private beach.
A beachfront resort as part of the new Jumeirah Beach Residence complex .
The project consists of three office buildings each of 7 stories, with a total of 22000 sq mt on one common 2 stories basement.
The storey area is 800 sq.mt. The buildings are sharing common two stories basement each of 8,250 sq.mt area
The scope covers full design of MEP works up to construction documents.
The building consists of 3 towers A, B & C for residential apartments.
The basement area is 12,124 m² serving as a parking area.
The ground floor is 9624m² including shops, admin. offices & parking area.
The mezzanine is 9276m² including apartments, clubhouse, swimming pools & landscape areas.
The scope covers full design of MEP works up to construction documents.
A district Cooling Plant located at a Service Island from which all other services are distributed to serve the islands within Oqyana World First,
the service island is around 1 Km far from the first served island, the plant was planned to serve all buildings on all islands including villas, water
homes, hotels with a total capacity of 33,000 TR. Chillers are to be cooled by sea water
Peer review of 12 high rise towers at Burj Dubai Development.
The towers are 25-28 stories on a podium for retail with two underground Car park floors.
The scope covers the design of MEP works related to the project up to design development stage.
Two high rise residential building consists of three car parking floors, ground, mezzanine, three podium floors and 21 typical floors each building, the project consists also of swimming pool, office amenity and retail areas.
Two residential towers (17 and 14 floors), with town houses and retail areas. The towers are having a total refrigeration capacity of 1050 T.R.